The configuration sequence of IU-PS interface is as follow:
- Configure the physical layer data for the ports that are required when ATM transport is applied.
- Configure ATM traffic resources.
- Add the data on the control plane of the Iu-PS interface.
- Add the data on the user plane of the Iu-PS interface.
MTP3-B Link
The MTP3-B link conception is the same as IU-CS interface.
IPoA PVC
The IPoA PVC is a PVC to the gateway of the SGSN. The IPoA PVC is terminated on the interface board of the RNC.
Tidak ada komentar:
Posting Komentar